Midway through its project lifespan, the planetGOLD project in Indonesia reflects on the achievement of its formalization target. Taking local situations into consideration, the project reflects that supporting the formalization of 60 mining groups in the 6 project locations within 5 years may not be easy. The project is therefore opting to re-route its supports based on the outputs resulting from each formalization target.
Download
English
PDF
0.65MB
Download
planetGOLD Authors: